The construction of the new storage track continues as the switch mechanism and switch target have been installed          
The new storage track has been pulled to a position parallel with the existing track. The new track has only gauge ties at this time and is awaiting ballast and final installation of cross ties.
Date: 4/4/2012 Location: Woodland, GA Views: 161 Collection Of:   Bernie Feltman
Author:  Bernie Feltman
The construction of the new storage track continues as the switch mechanism and switch target have been installed
Picture Categories: Signal,Track This picture is part of album:  CSX roster/still photos