UP 5368 Loaded Coal Entering "Big Ten Curve" on the UP Moffat Tunnel Sub         
After just emerging from Tunnel #1 on the UP Moffat Tunnel Sub, UP 5368 leads a loaded coal train with two leaders, 3 mid-train DPUs and a pusher past hot box detector 22.6 and into "Big Ten Curve." Blue Mountain Drive.
Date: 5/17/2015 Location: Rocky, CO Views: 265 Collection Of:   Kim Piersol
Locomotives: UP 5368(AC45CCTE) UP 7916(AC45CCTE)    Author:  Kim Piersol
UP 5368 Loaded Coal Entering "Big Ten Curve" on the UP Moffat Tunnel Sub
Picture Categories: This picture is part of album:  Moffat Tunnel Sub & Joint Line - May 2015
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4192730