Here is a view facing south from milepost 1.5 on the Wabtec/GE test tracks a mile and a half north of the company’s Fort Worth assembly plant. The left track was previously the ATSF/BNSF main line from Fort Worth to Oklahoma and points north, and milepost 368 can be seen next to the crossing bungalow. The right track - with the concrete ties – was built for GE after it acquired the BNSF line, and Farm-to-Market Road 156 is on the rigit. |